Pinar 18, 1997 (1.370 m2)
In 1997 the Pinar 18 building was opened, furnishing the campus with a further 1,370 m2. A major investment was made to equip the building with state of the art technology, including two computer rooms and the Data Processing Center. At the same time, the ground floor of the neighboring building, Pinar 14 – 16, was refurbished to house the Career Management Center.
Pinar, 18
1997
Architecture